London Road Resurfacing 25th April
20th April 2016 at 1:40PM
Hi All

From Monday 25th April, work will be commencing to patch and resurface the section of London Road from Torkington Road to Chester Road junctions.

As this is an extremely busy section of carriageway, the Council have proposed to do this work between the hours of 19:30 and 05:30 for 3 weeks. There will be temporary traffic lights in place on London Road BUT turning right from Torkington Road onto London Road will be prohibited.

I have naturally raised concerns about noise and the like that would affect residents close by on London Road, School Street etc. The Council have agreed that the pneumatic breaker will not be used after 11pm and works near properties will be kept to a minimum, using smaller equipment where applicable.

If you have any further questions or concerns, please let me know.
0 Likes 0 Dislikes Reply Reply Quote Quote Report Report  
TwistedBanana
Townsperson

TwistedBanana
Re: London Road Resurfacing 25th April
20th April 2016 at 4:55PM
The road on this section is in a pretty poor state. The residents locally may have to put up with a bit of noise while the work is going on but having recently worked in an office near this area, the noise created throughout the day by lorries hitting potholes, sunken grids etc is bloody awful so I would imagine they will be just happy to see things being sorted
0 Likes 0 Dislikes Reply Reply Quote Quote Report Report  
BlueGrover
Forum Moderator

BlueGrover
Re: London Road Resurfacing 25th April
21st April 2016 at 11:36AM, Edit: 21st April 2016 at 11:58AM by BlueGrover
If there is any of the black stuff left over,the stretch of Chester Road near the Conservative Club is a disgrace.
0 Likes 0 Dislikes Reply Reply Quote Quote Report Report  
glenandem
Forum Moderator

glenandem
Re: London Road Resurfacing 25th April
21st April 2016 at 11:43AM
Hope they resurface the part of the rd right at rising sun lights heading up high lane just before the park turning, there's a few pot holes there too!
Wasn't the a6 resurfaced when there was a massive burst water main near mcds not so long ago?
0 Likes 0 Dislikes Reply Reply Quote Quote Report Report  
OliverJohnstone
Hazel Grove Councillor

OliverJohnstone
Re: London Road Resurfacing 25th April
21st April 2016 at 11:54AM
Hi Glen - unfortunately due to the way that the Council has decided to arrange its programme of resurfacing works, Hazel Grove will not yet receive it's full entitlement to the Highways Investment Plan until after 2020.

However we are still fighting for resurfacing as witnessed with Cavendish, Poise Close and Torkington etc.

Yes there have been utility issues in this stretch and part of work will be to replace alot of the old ironwork that is down there in order to avoid such repeat incidents. The surface being laid in conjunction with the removal of the ironwork should go some way to reducing noise and vibration too.
0 Likes 0 Dislikes Reply Reply Quote Quote Report Report  
SUZI
Villager

SUZI
Re: London Road Resurfacing 25th April
2nd May 2016 at 3:36PM, Edit: 2nd May 2016 at 3:36PM by SUZI
I live on poise close and our road was resurfaced a few weeks back. I have lived here for 44 years and this is the first resurfacing we have had, it was long over due. Looks great now 😊

OliverJohnstone Wrote:

Hi Glen - unfortunately due to the way that the Council has decided to arrange its programme of resurfacing works, Hazel Grove will not yet receive it's full entitlement to the Highways Investment Plan until after 2020.

However we are still fighting for resurfacing as witnessed with Cavendish, Poise Close and Torkington etc.

Yes there have been utility issues in this stretch and part of work will be to replace alot of the old ironwork that is down there in order to avoid such repeat incidents. The surface being laid in conjunction with the removal of the ironwork should go some way to reducing noise and vibration too.
0 Likes 0 Dislikes Reply Reply Quote Quote Report Report  
Bakewell
Villager

Bakewell
Re: London Road Resurfacing 25th April
4th May 2016 at 12:12PM
Is this still on target to be done within 3 weeks?
They don't seem to have got very far and they seemed to have packed up and gone home by 11:20 last night.